FJR
Treehouser
That is fantastic Stephen, I am really happy for you! I think Randy's quote is spot on.
It has been the busiest it is ever been here as well. Jesse and Tim are averaging about 110 hours per two weeks and I couldn't be more proud of them. I have 4 weeks or heavy production booked ahead, but the downside is that we have no time to do bigger maintenance. This will be our first Sunday off in weeks. We want to fabricate and weld a new chip box for the freightliner, need to install two new 7k axles on the equipment trailer, and a lot of smaller stuff. It will just have to wait I guess.
It has been the busiest it is ever been here as well. Jesse and Tim are averaging about 110 hours per two weeks and I couldn't be more proud of them. I have 4 weeks or heavy production booked ahead, but the downside is that we have no time to do bigger maintenance. This will be our first Sunday off in weeks. We want to fabricate and weld a new chip box for the freightliner, need to install two new 7k axles on the equipment trailer, and a lot of smaller stuff. It will just have to wait I guess.

There was no room for them but I didn't want to send them away empty so we put em in the driveway instead of putting the chipper there, and so we lay the brush picks further down the drive for later chipping
The tree came down well but was hairy due to alot of high very dead tips, and the massive size of the trunk. Got everything done but the stump. My checkbook will get smacked around, but we survived another one

Gotta love it!