Dave Shepard
Square peg, round world.
I'm declaring February beat an engineer month. Sometimes they just make things harder February they need to be. A headlight bulb in my Golf should be a 30 second job. It isn't because they put a fuse box in the way. The fuse box could be just a half in smaller and it wouldn't be a problem. Just friggin' why?
Last edited:
. Thanks, engineers.