The Official Work Pictures Thread

Then I jacked each side a bit at a time, inserting 2x4s then 4x4s, then 6x6s, till i had it up to 6” above the wall
IMG_5423.jpeg
IMG_5442.jpeg
IMG_5425.jpeg

Once there I ran 6x6s across the wall and the cribbing, and laid the pipe sections on top
IMG_5444.jpeg
It was only a matter of pulling nice and slow with a come-along.
IMG_5447.jpeg
Success!

IMG_5449.jpeg
Took all day, but half of that time was spent moving all the other logs out of the way and down the street to their garage storage clients barn. Lots of fun!
 
i just noticed the first post i made is all garbled. something got it all out of whack when i tried loading pictures from my phone. hopefully it still makes sense.
 
Back
Top