The Official Work Pictures Thread

SRT Cory. Thinking about it I should?ve used two climbing systems for better work positioning. Just to many long limb walks that were hard to balance on. Could?ve cut down on that a bit. Live and learn. I also need to study up on retrievable redirects. Could?ve helped a lot
 
3D4E8980-02CB-4542-8FB3-924053211A51.jpg 5BBE496B-98A0-45DD-8626-8B1416D86374.jpg 7CE3D091-9560-4A43-B07B-0645833B1275.jpg
Even though I said I wasn?t going to do any work on fridays I had to do a bit of cleanup for the FD. No big deal. Two and a half hours first thing this morning. They asked for a quote to remove the rest of the tree as well.
 
Finished up nicely this week.

Timber gone.
Stumps ground.
Ch?que in wallet.
 

Attachments

  • 390CCA74-0706-4CA5-8701-F9ABB08A531E.jpg
    390CCA74-0706-4CA5-8701-F9ABB08A531E.jpg
    346.6 KB · Views: 39
  • D362AA4A-CE11-41CE-9126-EF495E7EEE7F.jpg
    D362AA4A-CE11-41CE-9126-EF495E7EEE7F.jpg
    393.1 KB · Views: 37
  • CADD879C-8102-4423-80FE-E615A2F3E2B6.jpg
    CADD879C-8102-4423-80FE-E615A2F3E2B6.jpg
    330.4 KB · Views: 36
Yeah, I flirt with idea of a bigger one, but I will be the only legal driver so it’ll be a pita.

On this job I had 3 trucks of chip, maybe 15 cubic meters, as I was 50 minutes away I put an ad on FB and someone local took it all.
 
Good pics, Mick.

Getting rid of chips via FB... where on there did you place your ad?
 
Thanks.

Chips are usually NP for me but it is a good idea to have in the toolbox.
 
That's a lotta trouble building a curved bridge like that one. Someone paid a lot extra for that.
 
That is a really cool bridge! Building curved stuff like that quite hard, takes more than the average termite to build one of those lol
 
Back
Top