SouthSoundTree-
TreeHouser
- Joined
- Sep 24, 2014
- Messages
- 4,941
<iframe width="560" height="315" src="https://www.youtube.com/embed/4WBw5TcZQzk" frameborder="0" allowfullscreen></iframe>
I would think that locking it off like that would increase the load as opposed to letting it run a bit, not a big deal in the video cut but it may be nice to have a ground person hold the rope at first then switch over control of the line.
I agree the stub was a bit small in the video.