The Official Work Pictures Thread

Looking forward to this drag.......gonna have to paper a lot of it.
491417232a79df829b1540dfe4f2d047.jpg

He's building a tiled shower room as part of the drag....never understand why they don't call me sooner in the construction. ...like the demo phase.

eb6322fa0756246fffb22d8f51849b45.jpg


1f0be2a5e98484785785a2aab94d777c.jpg


So much money going on behind that facade.

80k concrete patio alone....
 
You live and work in a whole different wild Deva. Nice you got to put some back though.

We got to fell logger rejects today.. oh the joy.
Sent Mike and Jason a head of us to untangle a couple limb locked ones while we were busy with the crane.
At least all the material, wood, chips and takings stay on site:|:

Try not to hit the little cedar games. Most of them were limb locked in 3-4 of the little buggers.
 

Attachments

  • tmp_3851-20160907_1044121118685820.jpg
    tmp_3851-20160907_1044121118685820.jpg
    294.9 KB · Views: 59
  • tmp_3851-20160907_1044191907451215.jpg
    tmp_3851-20160907_1044191907451215.jpg
    268.9 KB · Views: 56
  • tmp_3851-20160907_104438-567869477.jpg
    tmp_3851-20160907_104438-567869477.jpg
    303.7 KB · Views: 58
  • tmp_3851-20160907_133122-407901108.jpg
    tmp_3851-20160907_133122-407901108.jpg
    358.2 KB · Views: 59
  • tmp_3851-20160907_1331332111350190.jpg
    tmp_3851-20160907_1331332111350190.jpg
    396.9 KB · Views: 58
  • tmp_3851-20160907_1331451127841864.jpg
    tmp_3851-20160907_1331451127841864.jpg
    433.8 KB · Views: 60
never understand why they don't call me sooner in the construction. ...like the demo phase.

It's never that way it's always after the fact. Them "well the tree just died" me "sure it did and it rotted back to six inch wood over night"
 
Ray I did a 2 dead redwood removal by pool, HO said dont clean it "pool guy" will get it ....would have Loved to see his face when he got back to pool....priceless:lol:

P.S. I bombed ever piece..lol
Oh my. I'm sure he was not a happy camper. Cool pics Scott. I'll have to take some pics at the pool job, it will be interesting. It's in a no bombing zone with targets galore:tomcat: but speed lines are allowed;)
 
image.jpg
Got to practice my humbolt three times this morning. Dropped the stubs from yesterday's ash removal. Messing with more of those today.
 
Ray,
Like bots, I also left the mess for the pool guy =). He was there in the morning though so he knew he had a bit of a mess to deal with.
 
Stephen: I really appreciate all the stuff you've been throwing up as of late. Thanks and keep up the good work.

Deva: Nice Ginkos, brother. Man, I don't like the look of that next job. Looks like you're giving Mr. Benn some serious comp.

RLfailuer: Hope it's cooled down for ya a bit, bro. Just waaaay too late in the year for that kind of heat imho.
 
Is it still super dry there Stephan? It looks super dry. Awesome hinges man, you guys have been absolutely killing it.

Matdand, basswood are not cool, not cool at all. That wood is so weak and stringy, even their roots are sub par. Whenever we have a wind event, it's always to basswood that let go first. . .
 
Back
Top