Not logging but this is the new project I've got going on at the mill.
This is what I started with. Found in eastern KY.
Here it is back at our place. Got it anchored down. Mostly reassembled. Replacing some worn shaft, chains, bearings etc.
Almost have the 300ft of 3 phase installed.
We priced the control system being rebuilt they want 60K to come overhaul it. So looks like that is going to be left up to me to do as much as I don't want to. Guess I have a few months of wiring, programming, and hydraulic system install coming. Grrrr.
Oh yea in case anyone is wondering. It's a(going to be ) an automated lumber stacker.
Lumber will come in on one side roughly packaged and come out on the other ready to dry. 2-4 guys running it depending on how fast you want it to go. 1 worker will push a button. The other 1-3 will lay the sticks for each layer.
We've gone from 5 guys hand stacking and sticking the lumber when I was a kid doing it to 8-10 depending on who shows up now. They still can't stay caught up and seem to do it right.