today

  • Thread starter Thread starter Naturarbo
  • Start date Start date
  • Replies Replies 7
  • Views Views 888
  • Thread Starter Thread Starter
  • #5
@stig can make a little description with pics, not very good though.It was a bit stressfull as I had a newbie and was weekend, hate working on weekends but had to finish job.So video and photos were very few and not to good.
Red lines branches removed, red x 2 wrapped branches from removed tree, visible bend on the cupressus, red spiral top of removed tree that was over cable and was rigged in 1 piece, purple circles were rig anchors, orange line the electric cable, even with a bit of obstacles most tree was bombed down except removed and wrapped braches, top and last sections of trunk.
In the end was a 2 days job completed in 1. One got to love this shit. Tree people rock. image(2).jpg
 
Ok, 2 rig anchors.
That makes sense.
Thanks.
Still one hell of a job to do in one day with a rookie.

Question: What is that thing next to the car in the driveway?
 
Back
Top