Yeah but that’s a 30K job billed directly to insurance. That job required a 120T crane, 2 100’ lifts, excavator, avant, 20” chipper, and 2 chip trucks. Needed a crew of 8 and all this was double time for emergency work.
Edited to add: mostly sarcasm but based on what some companies do.