Search results for query: *

  1. M

    fat and old still getting the job done

    Here's the notch.. used the lazy man's cutting technique
  2. M

    fat and old still getting the job done

    Did over 4400 today, didn't leave the house til noon, saved one client over 2K.. no one else wanted to touch the tree... dead too long.... broke two tops out with high pull lines and the brute force of a skid steer, then one cut.. notch and drop and she was on the ground, minimal clean up. That...
  3. M

    fat and old still getting the job done

    <iframe width="560" height="315" src="https://www.youtube.com/embed/sRqm0yN4atc" frameborder="0" allow="autoplay; encrypted-media" allowfullscreen></iframe> When I AM in the bucket, undercuts are the exception instead of the rule...
  4. M

    fat and old still getting the job done

    Good questions... I worked my way up the rayco ladder and never looked elsewhere... Machines are reliable and I love the customer service... definitely over equipped... Almost a "collector" as I rarely run two machines the same day... It's a log story not to be floating around cyberspace, but...
  5. M

    fat and old still getting the job done

    That could give a whole new meaning to blowing up the grinder.
  6. M

    fat and old still getting the job done

    A lot of the men here don't approve of my use of skid steers.... Joke was on them the whole time.... When I was in my 20's and thirties I could make a living on hard work... times have changes.. to stay competitive you need the hardware... Everyone gets to find their own niche.... I can't...
  7. M

    fat and old still getting the job done

    This one went faster than I thought too.. It was 40 minutes travel time each way. We had to haul the grindings. I was expecting to have to grind through the fence post but the stump was soft enough that the skid steer just ripped it out.. I did hit metal with the saw after whittling it down...
  8. M

    fat and old still getting the job done

    This stump was 2,000 plus 500 for clearing a bunch of small trees along the fence line... She had a spot in the back for the chips so the loader kept the grindings out of the way so the machine didn't bog down in 3 feet of chips. I'd grind for a few minutes, pull back and let the loader in...
  9. M

    fat and old still getting the job done

    This one took 90 minutes.. without travel Smart like fox???
  10. M

    fat and old still getting the job done

    I do twice that or more when the stump work is lined up.... Not on this job though as I hooked him up. young family, working man, good guy... Contract called for leaving the grindings backfilled in hole, but we had the skid steer on sight and he had a place for them in the back yard so I threw...
  11. M

    fat and old still getting the job done

    Stig and all, Big sugar maple removal in the front yard.. wide canopy hanging over service wires, street primary, house, and jap maple... Medium Norway maple in the wide open backyard.. Load and a half of chips which is something over 30 yards... all wood cut and piled by street for log...
Back
Top