Naturarbo
Naturarbo
Quoted a job for 8k. dismantle and fell of 75 pines.After all agreed and a 2nd visit to site for last details, the owner calls 2 days before job starts and says someone is gonna do the job in exchange of wood.
Job lost to some gipsys.No problemo.
Should have charged to quote stupid me.
This makes business very dificult around here.
Now the owner wants to talk to me.
What to do if he wants the job done by me?
Job lost to some gipsys.No problemo.
Should have charged to quote stupid me.
This makes business very dificult around here.
Now the owner wants to talk to me.
What to do if he wants the job done by me?