Search results for query: *

  1. Nutball

    Power lines

    They'd have to crane each line up and over the towers, sounds difficult. They'd need to put the lines on pulleys hanging off each insulator and fine some way of controlling the slack between towers as they lift the line over.
  2. Nutball

    Power lines

    It is, but surely they have procedures for that such as insulated suits and grounding wires on the new lines, so they don't get energized by static or induction. They might have a switching mechanism or remote controlled tool for the final hookup. Maybe your friend can keep an eye out and take...
  3. Nutball

    Power lines

    Maybe they put up new lines, connect them in parallel to the old, then disconnect and remove the old lines.
Back
Top